•   (+965) 23912112
  •   (+966) 556884212
  •   (+971) 0502851330
  •   (+2) 01005270756
  •   (+249) 915443254
  • info@inductioncenter.com
  • slidebg1
    A State of the Art Trainning Solutions.
  • slidebg1
    Internationally recognized health and safety qualifications.
  • slidebg1
    Covering a wide range of disciplines and industries.


Drilling & Well Construction

Modern Well Testing Operations

Introduction

Well testers are usually one of the last crews that work on a well before it begins sending oil or gas to the refinery. Well testers do various tests on the wells to get information such as a well’s flow rate, pressure, salinity levels, or anything the oil company wants to know about the well.

This ten-day course will provide participants with a comprehensive theoretical and practical knowledge of well test operations and techniques and methods as well as all of the latest developments in the field. Emphasis will be placed on the practical aspects of well testing as a number of relevant examples will be presented. Participants will also be exposed to different basic well testing analysis techniques and a number of relevant examples will be presented as well.


Objectives

By the end of this course participants will be able to

  • Specify clear objectives for a well test and know the reasons for conducting a well test
  • Identify the appropriate type of test
  • Know how to clarify objectives for the well test (what information is required from the test)
  • Know how to select the appropriate type of test and how to select the duration of testing periods
  • Be more familiar with all types of well testing
  • Know how to conduct a well test
  • Know more about separators and separation operations
  • Design the well test duration and flow rates
  • Make the proper selection of surface separation equipment, gauge types, and sampling
  • Be more able to master operations related to pressure control, flow measurement and flow rate calculations
  • Specify what measurements are required on the test site and the required accuracy
  • Detail how real-time pressure monitoring can be used in decision making for a continuation of testing
  • Make the proper selection of gauge types, surface testing equipment, and sampling equipment
  • Know about the hazards and safety measures that should be made on conducting a well test

Target Audience

This course is designed for:

  • Oil well testers I
  • Oil well testers II
  • Oil production operators
  • Well loggers
  • Industry personnel who are required to have basic to intermediate knowledge of well testing operations in oil and gas companies

Drilling & Well Construction Outline

The course covers the following topics:

  • Oil & Gas Measurements
  • Water Cut Analysis
  • Instrument Control System for Test Operators
  • Reasons for conducting a well testing
  • Well test objectives
  • Types of well test
  • Gas well testing
  • Water injectivity tests
  • Separators and separation
  • Level control
  • Pressure control
  • Flow measurement
  • Two rate Flow Test Analysis
  • Variable-rate Flow Tests
  • Multi-rate Flow Test Analysis
  • Flow rate calculations
  • Checking and measuring all oil field wells
  • Well control operations
  • Data quality (Pressure, Production, and Fluids)
  • Well test separators equipment
  • Sub center valves and test lines handling
  • Test separator standard of oil height, control valves, and pressure gauges
  • Sampling & recording testing data’s
  • Linden up and shutdown test separators
  • Well test interpretations
  • Well test design and planning
  • Well testing hazards and safety measures
  • Covering and understanding how control loops are working
  • Reading & interpreting the cursor of presser gauges
  • Gas & liquid separation

  
  

Ref Location From To Cost
DW15 Kuwait 8-11-2020 12-11-2020